A large coal-fired power plant in Taiyuan, Shanxi, faced challenges in handling fly ash generated from its daily operations. The plant required a reliable and efficient conveying system to transport fly ash from collection points to storage silos, while addressing environmental and operational concerns.

The power plant experienced several issues with their existing fly ash handling approach:

To address these pain points, headpowder designed and implemented a sealed, automated fly ash conveying system tailored to the plant's layout and capacity requirements. Key elements of the solution include:

After commissioning, the plant achieved stable 24/7 fly ash transfer with reduced energy usage per ton of material. Dust emissions dropped to negligible levels, improving workplace safety and compliance with local environmental standards. Maintenance intervals increased by more than threefold compared to the previous system, lowering overall operating costs.
Shandong headpowder Engineering Co., Ltd.
156-6277-7102(Manager Zhang)
0531-83386006
Jinan City, Shandong Province, China 
服务热线
微信咨询
回到顶部